Hydro Power Dams
Hydro Power Dams Services
ConeTec has worked on hydro power dams across North America. Some of these are:
- Terzhagi Dam
- Bennett Dam
- Mayo Dam
- Peribonka Dam
- Bersimus Dam
- Peace River Dam
- Old Man River Dam
For these projects, ConeTec has carried out:
- CPT Testing
- SPT Testing
- Rotary Drilling
- Geophysical Testing
- Installation of Instrumentation
- Gas Sampling
The in-situ test data collected was used to evaluate:
- Stability
- Sinkholes
- Seepage and Flow
- Frozen Layers
- Settlement
- Liquefaction Potential



