highway 413

SECTOR: Marine Nearshore – LNG Export Facility

LOCATION: Humber River Valley, Ontario

DATE: 2024

EQUIPMENT: terra sonice 150 drill, hydracore hc5000s heli-portable sonic drill, MARL 20-ton Truck CPT, Portable Geophysics

We are proud to have collaborated with Thurber Engineering Ltd. on this important project for the Greater Toronto Area.

Using a Sonic Drill, a Heli-Portable Sonic Drill, a 20-Ton Truck CPT, and Portable Geophysics, our team successfully completed this challenging job.

SCOPE OF WORK

  • Drill through 120m+ of overburden

  • Diamond drill through bedrock

  • Downhole seismic testing within sonic casing

  • Piezometer installations

  • CPTs in upper 20m

 

CHALLENGES

  • Deep bedrock (over 400ft)

  • Challenging overburden soils

  • Difficult access (heli-portable required)

  • Environmentally sensitive area

Interested in working with us for your project?

      REQUEST A QUOTE        

 

53896242869_15bf99125e_o.jpg53896324080_3ce08e0ff9_o.jpg53896242144_db31901209_o.jpg011.JPG014.JPG53896146123_85c696349a_o.jpg