Francis Scott Key Bridge

SECTOR: Mine Tailings - Geotechnical

LOCATION: baltimore, maryland

DATE: 2024

EQUIPMENT: cpt truck rig, sonic drill rig, in-situ testing tools and marine barge platform

Following the partial collapse of the Francis Scott Key Bridge in 2024, the Maryland Transportation Authority immediately launched arebuild initiative. ConeTec’s New Jersey office was contracted by Kiewit to perform a comprehensive site characterization program, supporting both marine and land-based geotechnical investigations.
 

SCOPE OF WORK

 

MARINE

  • Cone Penetration Testing (CPTu)

  • Seismic Cone Penetration Testing (SCPTu)

  • Electric Vane Shear Testing (eVST)

  • Sonic Drilling

  • 15-40 ft of water depths​​​​​​​

ON-LAND

  • Cone Penetration Testing (CPTu)

  • Seismic Cone Penetration Testing (SCPTu)

 

SUCCESSES

  • This work was completed on an accelerated schedule, and ConeTec successfully met key project deadlines.